Project Scope and Work Breakdown Structure
Project Scope and Work Breakdown Structure
“Project Scope and Work Breakdown Structure (WBS)” Please respond to the following:
Select a project, and determine at least two (2) aspects of the project scope that might have the tendency to go out of scope and potentially derail the project. Next, develop a WBS that contains the three (3) levels of detail and takes the two (2) eventualities you determined into account.